The Kashmir Power Distribution Corporation Limited (KPDCL) attached three engineers including Executive Engineer while an inquiry has been ordered against them for withdrawing Rs 6 crores for non-existent works in Kupwara.
The Kashmir Power Distribution Corporation Limited (KPDCL) attached three engineers including Executive Engineer while an inquiry has been ordered against them for withdrawing Rs 6 crores for non-existent works in Kupwara.